Search Site

This search form uses an instant search feature. As you type, search results will appear automatically below the search field. When you've entered you desired search terms use tab to navigate through the available results and hit enter to open the selected page or document.
Facility Planning: Bus Garage
Facility Planning: Bus Garage
Morton School District
Wednesday, July 01, 2020

The first step in the facility planning process is reviewing facility needs and prioritizing projects for a possible bond measure. 

A series of assessments and studies were done prior to the 2017 bond election. These studies pointed out the District's biggest facility needs. Read the reporthttps://5il.co/hwjs for more information. 

The bus garage is a high-priority project. 

The current building has issues related to safety, efficiency and vehicle access. The original structure was built in 1942 and has had no updates since that time. The most cost-effective solution is to rebuild this building. Prior studies showed that repairing it would be more expensive than replacing it, and a new facility could be moved to unused District property behind the high school, which would allow more room for access without encroaching on neighboring property. 

The School Board will continue to review options as they develop the plans for a possible bond measure.